German power: price shape and battery value
In German day-ahead arbitrage, the recurring solar-driven price shape carries most of the value, and a price forecast earns on the days that shape breaks. This note measures the shape in Germany–Luxembourg (DE-LU) prices, values it for a battery against simple rules and the balancing markets, and tests what a forecast made at the auction gate adds.
4-hour battery: a rule that repeats the last similar day captured
Price shape,
Forecast evidence · Storage value · Methodology
1. The shape carries most of the value
A 1 MW / 4 MWh battery dispatched once a day can, with perfect foresight, earn
EUR
2. The forecast earns when the shape breaks
A per-hour Ridge regression, using only what is known at the 12:00 auction gate
on the day before delivery, cuts the mean absolute price error by
On the
Forecast evidence · Storage value
3. Why the shape exists
Installed solar rose from
The day turned from a plateau into a trough between two peaks, and the trough
arrives at the same hours on every sunny day. That regularity is why a simple
rule captures so much:
4. Beyond the day-ahead hour
Quarter-hour products, traded since October 2025, raise the day-ahead arbitrage
ceiling by
Risks to this view
- Gas prices. A cheaper marginal unit would lower the evening peak without lifting the midday trough.
- Grid-scale storage. Two- to four-hour batteries compete for this
spread. The fleet's average duration,
hours in , is the first sign of them arriving; the small balancing markets would fill first. - Market design. Fifteen-minute products, and any change to support payments in negative-price hours, change both the trade and its measurement.
- Evidence. The results are retrospective, on history inspected during
development. A prospective pilot has issued forecasts before the gate for
of delivery days attempted (as of ). It will show whether the process runs reliably, not whether the value holds across seasons.
Scope
- Markets: the DE-LU day-ahead auction, with hourly prices except in the quarter-hour study, and German FCR and aFRR capacity auctions. Continuous intraday trading is not modelled, for want of a free public price source; it is the natural next step.
- Battery: 1 MW with 1, 2 or 4 MWh, 90% round-trip efficiency, one charge–discharge cycle a day, empty at the start and end of each day. Margins are simulated under these assumptions: before operating, degradation and capital costs, and not a revenue estimate for a real asset.
- Partial year:
runs to mid-September, so its figures are not full-year values. In complete years since 2019, the January–September daily range differed from the full-year figure by −4% to +11% (−36% in 2021, when the gas spike came in the fourth quarter). - Sources: Energy-Charts (Fraunhofer ISE, CC BY 4.0), which republishes ENTSO-E and SMARD data, and regelleistung.net, the German TSOs' balancing platform. Definitions and assumptions.
Author
Pedro Cabral, power market analyst covering Brazil, Chile and Argentina. This independent project applies the same work on fundamentals and price formation to the German market.
Research repository · GitHub profile
Market context
Data through